Division Avenue from River Road to Beltline (Project completed)

Completed: Yes
MTIP: N/A Construction Year: 2015
Jurisdiction: City of Eugene Mode: Road
Pedestrian
Description:

The street is beginning to show age and load-related deterioration. To prevent further deterioration and avoid more costly repairs, this street is planned to be rehabilitated by removing and replacing the top layers of asphalt pavement. The more severely deteriorated sections will require reconstruction of the base. This will be accomplished by rototilling cement in to the road base before repaving. Work will also include reconstructing sidewalk access ramps throughout the project in order to comply with the Americans with Disabilities Act. This project will also add an 8-foot-wide pedestrian and bicycle path on the north side of section of road that parallels Beltline.

Business Access During Construction? Yes
Timeline:

This project is scheduled for construction in the summer of 2015.

Traffic Impacts:

The majority of work will occur at night. Drivers should expect lane closures and lane shifts during construction. Pedestrians should expect sidewalk detours during the sidewalk ramp work at the intersections. Bicyclists should expect to merge with motor vehicle traffic depending on available lane widths during construction. With any construction, drivers should expect equipment and workers in the roadway leading to congestion and delays during the work.

Work Schedule:

Prior to the start of street construction, the City’s arborists may be on site trimming trees to prevent overhead limbs from being damaged by construction equipment. Also prior to construction, utility companies (water, electricity, gas) may be on site adjusting their facilities in order to avoid conflicts with the work and prevent damage to their facilities.

Funding:

The major funding source is the local gas tax. Additional funds are provided by street maintenance and the pedestrian and bicycle portion of the voter-approved 2012 bond measure.

Contact: Kerry Werner
Project Notes:

www.eugene-or.gov/pwprojects

Short Description:

Street paving for Division Avenue.

 