Royal Avenue Paving Repairs (Highway 99 to Waite S (Project completed)

Yes
|
|
None
|
2011
|
City of Eugene
|
Road
|
The street is showing significant deterioration, so the existing pavement and base rock will be completely removed and replaced, or alternatively, recycled in-place and repaved, curb to curb. Sidewalk access ramps may be reconstructed at several locations.
|
Work is anticipated to begin in mid-June
|
The street is showing significant deterioration, so the existing pavement and base rock will be completely removed and replaced, or alternatively, recycled in-place and repaved, curb to curb. Sidewalk access ramps may be reconstructed at several locations.
|
More detailed scheduling information will be provided once construction begins.
|
The major source of funding for this project comes from 2008 voter-approved bond measure to fix city streets. Additional funding is coming from stormwater and wastewater utility fees.
|
Brian Davies
|
More information about this project is availabl
|
|